The scope included complete internal painting, including all exposed services within open ceiling zones. New vinyl and carpet flooring was installed throughout the tenancy, complemented by tiling to wet areas and splashbacks within newly constructed kitchenette facilities.
Custom joinery kitchenettes were installed and supported by new hydraulic plumbing connections. Electrical works included the installation of new GPOs, structured data cabling, and upgraded lighting systems. Mechanical works comprised HVAC modifications and extensions, thoughtfully integrated within the open ceiling design to ensure optimal performance without compromising visual appeal.
The completed fitout delivers a high-quality, modern workspace that aligns seamlessly with the Civic Centre’s architectural character and operational requirements.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.