Forrestfield Bus Depot Industrial Construction Perth

Swan Group designed and built the Forrestfield Bus Depot for Transperth via Programmed, a 19,000 sqm facility completed in December 2025 over 70 weeks.

Location: Forrestfield
Designers: MPS Architects, Structerre, Hutchinson’s and Associates, Decobu
Size: 19,000 sqm
Duration: 70 weeks
The depot was purpose-built to house a mixed fleet of electric and diesel buses.

Everything a working bus fleet needs

The facility comprises an administration complex, a bus maintenance workshop fitted with in-ground service pits, and a combined wash and fuel facility. A range of auxiliary structures supports the workshop, including a fluid store, a spray booth and battery storage facilities. The in-ground service pits allow maintenance crews to work under a full-size bus without lifting it.

Digging deep before the buses roll in

The depot required significant site development. Swan Group installed more than 600 linear metres of new sewer infrastructure, extended water services and carried out major site power upgrades.

Keeping established trees on an industrial site

The project was delivered in full compliance with environmental management plans and council requirements. Existing trees were retained where possible, supporting long-term fauna and wildlife habitats on the site.

Retaining established trees on a 19,000 sqm industrial site constrains where plant, laydown and hardstand can go, so it is a decision that has to be made early.

Handing over the keys on day one

The depot was delivered as a complete turnkey solution. Transperth’s contracted service provider was able to begin operating from the facility on completion.

Delivering design and construct projects across Perth