The scope delivered:
The contract included in-ground EV design and installation across the entire site. Swan Group supplied and installed the concrete plinths and charger infrastructure, including satellite charger heads and EV power units. The team also laid the high-voltage electrical and communications networks required to power the fleet.
The site required environmental remediation before structural works could proceed. Swan Group treated contaminated soil and cleared obsolete industrial buildings across the footprint.
Swan Group deployed drone mapping to document site levels and subsurface anomalies. This provided survey-grade data to guide excavation, cut down rework, and keep ground remediation on schedule.
Swan Group delivered the project in partnership with MPS Architects, Decobu, Hutchinson’s and Associates, Structerre and Associated Air.