Comprehensive staging was a key reason Swan was selected. High-level cladding works were delivered using a cantilevered scaffold system, which allowed safe access while the building remained in use. The lobby refurbishments refreshed entrance statements and improved wayfinding through targeted lighting and signage. Exterior works included the replacement of combustible aluminium panels, coordinated alongside the interior stages to keep the program moving and the site tidy.
The staged approach let critical works proceed while day-to-day building operations continued. Three lifts were modernised, lobby areas were renewed across multiple levels, and external cladding was replaced where required. The result is a clearer arrival sequence, better wayfinding, and a stronger link to Allendale Arcade, all delivered within a coordinated ECI, D and C framework.