A key part of the scope was the installation of a new staff hub. This area included a kitchen with integrated appliances, stone benchtops, custom cabinetry, and a large breakout space finished with polished concrete flooring. The fitout also included built-in staff lockers and integration with the existing building infrastructure.
This was a collaborative effort from the start. State 28 led the design, ATA coordinated building services, and Swan Group carried the construction through. That partnership kept intent and delivery aligned, so the floorplate reads as one coherent space rather than a collection of parts. The outcome is a high-quality office, refreshed from end to end, that reflects the tenant’s brief. The project was delivered within the eight-week construction period. Practical completion was achieved without major variations or delays. The client stated: “The team of Mark and Rob has been incredible and definitely up there with the best team we have worked with. Tight timeframe and a job well done by all.” Level 1 at 28 The Esplanade now holds a full floor refurbishment tailored to a new tenant, with open plan work areas, collaboration spaces, and a central staff hub with polished concrete floors and lockers. Swan Group delivered the construction in close partnership with State 28 and ATA, keeping the focus on a flexible, practical workplace that supports collaboration and everyday momentum.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.