Swan was engaged to deliver the construction of 13 apartments for the Department of Communities.

Location: Bayswater
Size: 1000m2
Duration: 64 weeks
The project involved taking over from a previous contractor, with works having reached the substructure level of the first floor at the time of handover.

Swan was responsible for overseeing and managing all aspects of the site’s construction. Throughout the project, numerous challenges arose, including working within tight boundaries and inheriting incomplete works from the previous builder.

Despite these obstacles, Swan successfully delivered a well-crafted facility, offering high-quality finishes and functional living spaces designed for comfort.